Landsat 8

Landsat 8
Landsat 8 during ground testing
NamesLandsat Data Continuity Mission
Mission typeSatellite imagery
OperatorNASA  / USGS
COSPAR ID2013-008A Edit this at Wikidata
SATCAT no.39084
Website[1]
Mission duration5 years (planned)
10 years (with fuel)
Elapsed: 11 years, 9 months, 3 days
Spacecraft properties
SpacecraftLandsat 8
Spacecraft typeLEOStar
BusLEOStar-3
ManufacturerOrbital Sciences (prime)
Ball Aerospace (OLI)
NASA GSFC (TIRS)
Launch mass2,623 kg (5,783 lb)
Dry mass1,512 kg (3,333 lb)
Start of mission
Launch date11 February 2013, 18:02:00 UTC
RocketAtlas V 401 (AV-035)
Launch siteVandenberg, SLC-3E
ContractorUnited Launch Alliance
Entered service30 May 2013
Orbital parameters
Reference systemGeocentric orbit[1]
RegimeSun-synchronous orbit
Altitude705 km
Inclination98.22°
Period98.8 minutes
Instruments
Operational Land Imager (OLI)
Thermal Infrared Sensor (TIRS)

Landsat Data Continuity Mission (LDCM) mission patch

Landsat 8 is an American Earth observation satellite launched on 11 February 2013. It is the eighth satellite in the Landsat program; the seventh to reach orbit successfully. Originally called the Landsat Data Continuity Mission (LDCM), it is a collaboration between NASA and the United States Geological Survey (USGS). NASA Goddard Space Flight Center in Greenbelt, Maryland, provided development, mission systems engineering, and acquisition of the launch vehicle while the USGS provided for development of the ground systems and will conduct on-going mission operations. It comprises the camera of the Operational Land Imager (OLI) and the Thermal Infrared Sensor (TIRS), which can be used to study Earth surface temperature and is used to study global warming.[2]

The satellite was built by Orbital Sciences Corporation, who served as prime contractor for the mission.[3] The spacecraft's instruments were constructed by Ball Aerospace & Technologies and NASA's Goddard Space Flight Center (GSFC),[4] and its launch was contracted to United Launch Alliance (ULA).[5] During the first 108 days in orbit, LDCM underwent checkout and verification by NASA and on 30 May 2013 operations were transferred from NASA to the USGS when LDCM was officially renamed to Landsat 8.[6]

  1. ^ "Landsat 8 Orbit". Heavens Above. 28 May 2016. Retrieved 28 May 2016.
  2. ^ Li, Rita Yi Man; Chau, Kwong Wing; Li, Herru Ching Yu; Zeng, Fanjie; Tang, Beiqi; Ding, Meilin (2021). Ahram, Tareq (ed.). "Remote Sensing, Heat Island Effect and Housing Price Prediction via AutoML". Advances in Artificial Intelligence, Software and Systems Engineering. Advances in Intelligent Systems and Computing. Cham: Springer International Publishing: 113–118. doi:10.1007/978-3-030-51328-3_17. ISBN 978-3-030-51328-3.
  3. ^ "Fact Sheet - LDCM Earth Image Collection Satellite" (PDF). Orbital Sciences Corporation. Retrieved 12 February 2013.
  4. ^ "LDCM Spacecraft". NASA. Retrieved 12 February 2013. Public Domain This article incorporates text from this source, which is in the public domain.
  5. ^ "United Launch Alliance Successfully Launches Second NASA Payload in Just 12 Days". United Launch Alliance. 11 February 2013. Archived from the original on 7 December 2013. Retrieved 12 February 2013.
  6. ^ "Landsat 8 Satellite Begins Watch". NASA. 30 May 2013. Public Domain This article incorporates text from this source, which is in the public domain.

Developed by StudentB