This is the template test cases page for the sandbox of Template:Infobox power transmission line. to update the examples. If there are many examples of a complicated template, later ones may break due to limits in MediaWiki; see the HTML comment "NewPP limit report" in the rendered page. You can also use Special:ExpandTemplates to examine the results of template uses. You can test how this page looks in the different skins and parsers with these links: |
{{Infobox power transmission line|AC_voltage= |DC_voltage=±500 kV |cable_installer= |cable_layer= |cable_manufacturer= |capacity=2,000 MW |caption= |construction= |contractors= |coordinates= |country=[[Israel]]<br/>[[Cyprus]]<br/>[[Greece]] |current_type=[[HVDC]] |decom= |direction= |est= |expected=[[Cyprus]]-[[Israel]] 2019<br>[[Crete]]-[[Athica]] 2020<br>[[Cyprus]]-[[Crete]] 2022 |finish=[[Attica]],[[Greece]] |key_people=hhhhhh |lat= |length=1520 |length_mi= |long= |map= |name=EuroAsia Interconnector |operator= |owner=EuroAsia Interconnector Ltd. <br> (CEO: [[Nasos Ktorides]]) |par= |partners=ooo |photo= |poles_no=2 |province= |start=[[Hadera]],[[Israel]] |state= |substation_installer= |substation_manufacturer= |through=[[Kofinou]],[[Cyprus]]<br />[[Korakia]],[[Greece]] |type=[[Submarine power cable]] |website=http://www.euroasia-interconnector.com/}}
{{Infobox power transmission line}}
EuroAsia Interconnector | |
---|---|
Location | |
Country | Israel Cyprus Greece |
From | Hadera,Israel |
Passes through | Kofinou,Cyprus Korakia,Greece |
To | Attica,Greece |
Ownership information | |
Owner | EuroAsia Interconnector Ltd. (CEO: Nasos Ktorides) |
Key people | hhhhhh |
Partners | ooo |
Construction information | |
Expected | Cyprus-Israel 2019 Crete-Athica 2020 Cyprus-Crete 2022 |
Technical information | |
Type | Submarine power cable |
Type of current | HVDC |
Total length | 1,520 km (940 mi) |
Power rating | 2,000 MW |
DC voltage | ±500 kV |
No. of poles | 2 |
Website | http://www.euroasia-interconnector.com/ |
{{Infobox power transmission line/sandbox}}
EuroAsia Interconnector | |
---|---|
Location | |
Country | Israel Cyprus Greece |
From | Hadera,Israel |
Passes through | Kofinou,Cyprus Korakia,Greece |
To | Attica,Greece |
Ownership information | |
Owner | EuroAsia Interconnector Ltd. (CEO: Nasos Ktorides) |
Key People | hhhhhh |
Partners | ooo |
Construction information | |
Expected | Cyprus-Israel 2019 Crete-Athica 2020 Cyprus-Crete 2022 |
Technical information | |
Type | Submarine power cable |
Type of current | HVDC |
Total length | 1,520 km (940 mi) |
Power rating | 2,000 MW |
DC voltage | ±500 kV |
No. of poles | 2 |